Overview:

I-710 is the major freight corridor between the Ports of Los Angeles / Long Beach to the central Los Angeles railyards. Metro desired to pursue a 21 mile corridor wide project to study improvements along the route which would help facilitate goods movement. Alternatives 5c and 7 are two identified build alternatives. Alternative 5c widens the freeway by one lane in each direction and Alternative 7 adds an exclusive 4-lane freight corridor facility paralleling the I-710. Civil Works was part of the URS Project Team for the preparation of the PA/ED. Some of our tasks included preparation of geometrics at specific interchanges, a river impact report, the Water Quality Assessment Report for the corridor, the Storm Water Data Report for the corridor, cost estimates, and development of fact sheets.

 

The Civil Works Engineers, Inc. (CWE) team is pleased to announce that
as of July 15th, 2022 we have joined the team at David Evans and Associates, Inc.

We will continue to provide our services as part of David Evans and Associates, Inc.

Please note our new contact information:

Marie Marston: Marie.Marston@deainc.com, (714) 665-4561

Reception: (800) 721-1916