TRANSPORTATION     SITE DEVELOPMENT
    DRAINAGE & STORMWATER

 

714.966.9060 phone 
714.966.9085 fax

3151 Airway Avenue, Suite T-1
Costa Mesa, CA 92626

 

STREET NARROWINGS & CALMINGS

 

Foothill Boulevard/Citrus Avenue Improvements

Azusa, CA

Client: Azusa Pacific University, City of Azusa, City of Glendora, Citrus College

 

Foothill Boulevard / Citrus Avenue 1   Foothill Boulevard / Citrus Avenue 2

 

Foothill Boulevard / Citrus Avenue 3

 

Due to the high numbers of student pedestrians and bicyclists, the Cities and the colleges decided to narrow Foothill Boulevard to provide space for a class 1 bike lane for a 1/2 mile length along the north 
side of the street (pictured right). They also wanted a new right turn pocket on Citrus Avenue accessing Citrus College (pictured left). As a result of these roadway changes drainage modifications, signal modifications, and striping modifications were also required as well as new ADA compliant curb ramps and driveway approaches.

The volume of pedestrian traffic using the City sidewalk necessitated the widening of the existing sidewalk to provide adequate width for both pedestrians and bicycles.

We prepared preliminary design and final construction documents. 

 

top of page

 

HOME | ABOUT US | SERVICES | PROJECTS | CONTACT US

CERTIFICATIONS | SITE MAP


Copyright 2010 Civil Works Engineers. All rights reserved.