TRANSPORTATION
    SITE DEVELOPMENT
    DRAINAGE & STORMWATER

 

714.966.9060 phone 
714.966.9085 fax

3151 Airway Avenue, Suite T-1
Costa Mesa, CA 92626

 


SWPPP

 

Arcadia Unified School District - Dana Middle School and Baldwin Stocker Elementary School

Arcadia, CA

Client: LPA

 

The Arcadia Unified School District decided to undergo a modernization project for Dana Middle School and Baldwin Stocker Elementary School. The AUSD hired LPA as the project architect who in turn hired CWE to perform the site civil engineering. The project included a new building and parking lot improvements at the Baldwin Stocker ES, and a new music building, a joint use gymnasium, site improvements and modernization at the Dana MS. 

 

We provided utility research for the schools to prepare comprehensive base map for each campus. We also prepared demolition, grading and wet utility plans for schematic design, design development, and construction documents, and a SWPPP. The civil engineering aspect of the projects included grading and drainage modifications, ADA accessibility, utility connections to new/modified buildings, and parking/drop-off area modifications. 

 

The School District decided to improve the drainage system at Dana Middle School and asked CWE to design and prepare construction documents for a new storm drain connection to the Los Angeles County facility in the adjacent street. The improvements will include an infiltration basin and filtration device to meet the County’s SUSMP requirements.

 

top of page

 

HOME | ABOUT US | SERVICES | PROJECTS | CONTACT US

CERTIFICATIONS | SITE MAP


Copyright ©2010 Civil Works Engineers. All rights reserved.